长江口河工模型试验中的仪器设备

Instrument and mobile equipment in Yangtze River Estuary model tests

  • 摘要: 介绍了长江口深水航道整治工程物理模型试验中配置的上、下游潮汐及旋转流发生和控制系统.简要介绍了系统中配置且自行研制的水位仪、地形仪、流速仪和测沙仪及其性能指标.

     

    Abstract: The generating and controlling system of the upstream runoff, downstream tidal current and rotational flow in the physical model test for the Yangtze River Estuary deep channel training project is introduced. The corresponding equipment and self-developed gauges in the system, such as water level metre, topography metre, velocity metre and sediment metre, and performance indexes are briefly introduced.

     

/