Caulking and reinforcement between water pipeline and vertical shaft in Xiangshuitan Reservior

  • Between the bottom of the vertical shaft and the connected part of sluice gate chamber,there is a crack 11. sin in length and 2-20mm in width. We use chemical grouting to caulk it and reinforce structure by adhesion technology of steel plate. The methods get good results,and these buildings have been used for four years.