胡智农,周小兵,邓铭江,卢安琪. "635"水利枢纽发电引水洞竖井混凝土防腐处理[J]. 水利水运工程学报, 2002, (1): 31-34.
引用本文: 胡智农,周小兵,邓铭江,卢安琪. "635"水利枢纽发电引水洞竖井混凝土防腐处理[J]. 水利水运工程学报, 2002, (1): 31-34.
HU Zhi nong ,ZHOU Xiao bing ,DENG Ming jiang ,LU An qi. Corrosion prevention treatment of concrete of intake shaft well for "635" hydro-power project[J]. Hydro-Science and Engineering, 2002, (1): 31-34.
Citation: HU Zhi nong ,ZHOU Xiao bing ,DENG Ming jiang ,LU An qi. Corrosion prevention treatment of concrete of intake shaft well for "635" hydro-power project[J]. Hydro-Science and Engineering, 2002, (1): 31-34.

"635"水利枢纽发电引水洞竖井混凝土防腐处理

Corrosion prevention treatment of concrete of intake shaft well for "635" hydro-power project

  • 摘要: 针对“635”水利枢纽发电引水洞竖井混凝土腐蚀破坏的原因,通过室内试验选定了防腐材料和竖井防腐混凝土。设计了竖井衬砌混凝土的防腐处理方案,使竖井混凝土的防腐措施有效、经济、安全可靠。

     

    Abstract: Based on the analyses of concrete corrosion mechanism of the shaft well for "635" hydro power project, the anti corrosion materials and anti corrosion concrete for the shaft well are selected through laboratory tests, and the corrosion prevention treating method for the shaft well concrete is designed. Treatment results show that the corrosion prevention treating method is effective, economical and safe.

     

/

返回文章
返回