[1] 水利部, 国家统计局. 第一次全国水利普查公报[M]. 北京: 中国水利水电出版社, 2013.

Ministry of Water Resources, National Bureau of Statistics. Bulletin of first national census for water[M]. Beijing: China Water Power Press, 2013. (in Chinese)
[2] 孙玮玮, 李雷. 基于模糊数学理论的大坝风险后果综合评价[J]. 水利水运工程学报,2010(4):16-20. (SUN Weiwei, LI Lei. Comprehensive hazard assessment model for consequences caused by dam failure based on fuzzy mathematics method[J]. Hydro-Science and Engineering, 2010(4): 16-20. (in Chinese) doi:  10.3969/j.issn.1009-640X.2010.04.004
[3] 李升. 大坝安全风险管理关键技术研究及其系统开发[D]. 天津: 天津大学, 2012.

LI Sheng. Key technology research and system development of dam safety risk management[D]. Tianjin: Tianjin University, 2012. (in Chinese)
[4] 彭雪辉, 盛金保, 李雷, 等. 我国水库大坝风险标准制定研究[J]. 水利水运工程学报,2014(4):7-13. (PENG Xuehui, SHENG Jinbao, LI Lei, et al. Research on dam risk criteria of China[J]. Hydro-Science and Engineering, 2014(4): 7-13. (in Chinese) doi:  10.3969/j.issn.1009-640X.2014.04.002
[5] 赵博剑, 孔德琨, 谭忠盛. 基于层次分析理论的宜万铁路隧道病害评价体系[J]. 土木工程学报,2017,50(增刊2):243-248. (ZHAO Bojian, KONG Dekun, TAN Zhongsheng. Yichang-Wanzhou railway tunnel disease evaluation system based on analytic hierarchy process[J]. China Civil Engineering Journal, 2017, 50(Suppl2): 243-248. (in Chinese)
[6] 范英, 李辰, 晋民杰, 等. 三角模糊数和层次分析法在风险评价中的应用研究[J]. 中国安全科学学报,2014,24(7):70-74. (FAN Ying, LI Chen, JIN Minjie, et al. Research on application of triangular fuzzy number and AHP in risk evaluation[J]. China Safety Science Journal, 2014, 24(7): 70-74. (in Chinese)
[7] 岳强, 刘福胜, 刘仲秋. 基于模糊层次分析法的平原水库健康综合评价[J]. 水利水运工程学报,2016(2):62-68. (YUE Qiang, LIU Fusheng, LIU Zhongqiu. Comprehensive assessment of plain reservoir health based on fuzzy and hierarchy analyses[J]. Hydro-Science and Engineering, 2016(2): 62-68. (in Chinese)
[8] 段存国. 岸堤水库大坝安全模糊评价应用研究[D]. 济南: 山东大学, 2011.

DUAN Cunguo. Study on application of fuzzy assessment to dam safety of reservoir[D]. Ji’nan: Shandong University, 2011. (in Chinese)
[9] 刘阳, 向波, 张建经, 等. 公路边坡地震失稳规模模糊综合统计评估[J]. 中国安全科学学报,2018,28(4):169-174. (LIU Yang, XIANG Bo, ZHANG Jianjing, et al. Fuzzy comprehensive statistical assessment of highway slope seismic instability scale[J]. China Safety Science Journal, 2018, 28(4): 169-174. (in Chinese)
[10] 冯学慧. 基于熵权法与正态云模型的大坝安全综合评价[J]. 水电能源科学,2015,33(11):57-60. (FANG Xuehui. Evaluation of dam safety based on cloud model and entropy weight method[J]. Water Resources and Power, 2015, 33(11): 57-60. (in Chinese)
[11] NI H H, CHEN A, CHEN N. Some extensions on risk matrix approach[J]. Safety Science, 2010, 48(10): 1269-1278. doi:  10.1016/j.ssci.2010.04.005
[12] 顾冲时, 苏怀智, 刘何稚. 大坝服役风险分析与管理研究述评[J]. 水利学报,2018,49(1):26-35. (GU Chongshi, SU Huaizhi, LIU Hezhi. Review on service risk analysis of dam engineering[J]. Journal of Hydraulic Engineering, 2018, 49(1): 26-35. (in Chinese)
[13] 张超, 张社荣, 崔溦, 等. 地下洞室群围岩稳定性动态风险分析及系统研发[J]. 水利水运工程学报,2015(3):73-80. (ZHANG Chao, ZHANG Sherong, CUI Wei, et al. Dynamic risk analysis and system development for stability of surrounding rock of underground carven group[J]. Hydro-Science and Engineering, 2015(3): 73-80. (in Chinese)