柘田水库溢洪道底流消能试验

Energy dissipation by hydraulic jump test in spillway of Zhetian reservoir

  • 摘要: 在水工模型试验基础上,提出了在河岸式溢洪道弯道陡槽、底流消能设计中,处理泄流冲击波的方法,且效果良好。

     

    Abstract: Based on the hydraulic model test, the trealment of shock wave in the design of spillway chute bend is proposed,and its effect is good.

     

/

返回文章
返回