洪门水库溢洪道消能试验

Energy dissipation tests in spillway of Hongmen reservoir

  • 摘要: 经对比试验,针对洪门水库溢洪道水流佛汝德数低及转向归槽的特点,提出稳妥可靠的二级消力池底流消能方案。运行表明,效果良好。

     

    Abstract: In spillway of the Hongmen reservoir,to counter the flow characteristic of low Froude number and turning a corner to channel,after large numbers of contrast experiments,a reliable scheme of energy dissipation by two-stage stilling basin is raised.Practice has proved that its effect is good.

     

/

返回文章
返回