金山咀港区各规划方案的港内泥沙淤积
Silt accumulation of each planning scheme for Jinshanzui harbor reach
-
摘要: 根据金山咀港区物理模型试验的成果,从各规划方案港区水流形态的变化,讨论了适用于港区各规划方案的淤积计算式,计算了各方案港内泥沙淤积强度、淤积量和淤积分布。结果表明,从港内泥沙淤积角度看,在金山咀地区建港是可行的。Abstract: Based on the test results of physical model for Jinshanzui harbor reach, through the changes of flow pattern within the harbor reach of each planning scheme, computative formulas for siltation suitable to each planning scheme were discussed, the silting intensity, amount of silting and distribution of siltation were computed also. The results expressed that from the point of view of silt accumulation, it is feasible to build harbor at Jinshazui region.