丁坝头冲深和堵口抛石大小的计算
Calculation of scour depth around groyne head and size of riprap in closure work
-
摘要: 将局部冲刷计算式应用到丁坝头和堵口截流冲坑深度的计算,并引用绕板桩渗流场渗势理论计算水流绕坝头的单宽流量(或流速),而给出了进占堵口丁坝坝头护脚抛石的稳定性计算式,经过验算,冲深与抛石稳定性的计算与实际工程的结果较为一致。Abstract: A local scour depth formula is applied in the calculation of scour depth around a groyne head in a closure work, and the unit discharge (or velocity) around the groyne head is computed by use of the potential flow theory in seepage field. A formula reflecting the stabilization of riprap in a closure work and of groyne head apron is thus deduced. The calculation results of scour depth and stabilization of riprap are consistent with the actual situation.