外高桥顺岸桩基码头泥沙回淤及分析

Analyses on sediment deposition along pile wharf of Waigaoqiao Port

  • 摘要: 顺岸式桩基码头前沿会发生较为严重的泥沙淤积.以长江口外高桥港区码头为例,根据现场实测水深资料,并结合物理模型试验及数学模型计算的结果,分析建码头后影响码头前沿泥沙回淤的因素.桩基的阻水作用,减小了码头前沿的水流速度,是码头回淤的主要原因。

     

    Abstract: There is a serious sediment deposition in the wharf apron of an alongshore pile wharf. Based on the in-situ measured data of water depth and results of physical model tests and mathematic model calculation, the influencing factors on the sediment deposition in the wharf apron after construction of wharfs are analyzed taking the wharfs in Waigaoqiao Port in the Yangtze River estuary as an example. Analysis results show that the main factor of sediment deposition is the decrease of flow velocity in the wharf apron caused by pile resistance effects.

     

/

返回文章
返回