Abstract:
The deformation of a composite dam is studied by means of centrifugal model test and numerical method. Most of the settlement is completed during the construction, and the impoundment has little effects on the settlement. Differential settlement is observed between different sections of the dam, which is mostly completed during the construction and is affected by the impoundment very slightly. The overall stability of different sections of the dam is very high during construction, impoundment and operation.