Analysis of dam failure trend of China from 2000 to 2018 and improvement suggestions
-
摘要: 截至2018年底,我国已建成各类水库98 822座,总库容8 953亿m3。水库工程不仅是我国防洪体系的重要组成部分,更是优化水资源配置的关键工程措施。水库大坝一旦溃决将严重危及公共安全,从历史溃坝事件中吸取教训并分析溃坝特征规律,对提高水库安全管理和防灾减灾水平具有重要意义。在收集我国1954—2018年发生的3 541起溃坝事件的基础上,重点针对2000—2018年发生的84起溃坝事件,从空间分布、水库规模、坝高、坝型、溃坝原因、溃坝率等方面进行了详细统计分析,系统梳理了21世纪以来我国溃坝事件的规律趋势特征,主要包括:(1)气候变化背景下超标准洪水成为水库漫顶溃决的主因;(2)水库因工程质量导致的溃坝问题突出;(3)水库运行管理不当成为溃坝事件重要诱因;(4)西部地区溃坝率较其他地区仍然偏高。为进一步加强我国水库大坝安全管理,提出必须重视气候变化对水库大坝安全运行风险的影响、完善工程建设与运行安全监管体系、改善中西部地区大坝安全管理运行条件、兼顾水库安全管理工程措施与非工程措施等对策建议。Abstract: At the end of year 2018, the total number of built reservoirs in China reached 98, 822, with a total storage capacity of 895.3 billion m3. Reservoirs are not only important parts of national flood defense system, but also are key engineering measures to optimize the allocation of water resources. However, once a dam failure incident happens, it will involve major public safety. In-depth analysis of the historical data of dam failure cases is of great significance for preventing dam failure and improving the management level of disaster prevention and mitigation. Based on the collection of 3541 dam failure cases that occurred in China from 1954 to 2018, this paper focuses on 84 dam failure cases that occurred from 2000 to 2018. Detailed statistical analysis of the dam failure cases is carried out from the perspective of spatial distribution, reservoir size, dam height, type, failure causes, and other aspects. The trend characteristics of dam failure cases since 2000 can be summarized as: (i) Over-standard flooding becomes the main cause of dam failure cases of overtopping; (ii) Dam failure cases caused by quality defects at different locations of reservoirs significantly increased; (iii) The dam failure rate in the western part of China is dramatically higher than in other regions; (iv) Improper operation and management of reservoirs has become an important reason of dam failure incidents. Based on the aforementioned analysis, suggestions for further strengthening the dam safety management are proposed including that more attention should be paid to the impact of climate change on reservoirs, the engineering construction and operation safety supervision system should be continuously optimized, the management and operation conditions in the central and western regions of China should be intrinsically improved, and engineering measures and non-engineering measurements should be taken into account simultaneously in the field of dam safety management.
-
表 1 1954—2018年3个阶段的溃坝统计
Table 1. Dam break statistics of three stages from 1954 to 2018
阶段 年份 大型/座 中型/座 小(1)型/座 小(2)型/座 合计/座 占比/% 年均溃坝率/% 溃坝高发阶段 1954—1960年 64 156 129 349 10 0.0574 1961—1970年 27 156 407 590 17 0.067 9 1971—1980年 2 26 282 1 728 2 038 58 0.234 7 显著下降阶段 1981—1990年 4 46 214 264 7 0.031 7 1991—1999年 2 28 186 216 6 0.028 2 趋于稳定阶段 2000—2009年 5 9 34 48 1 0.005 5 2010—2018年 2 10 24 36 1 0.004 0 合计 2 130 687 2 722 3 541 100 0.062 9 注:年均溃坝率计算中水库总数(单位:座)取值分别为:86 852[12](1954—1980年)、83 387[21](1981—1990年)、85 120[22](1991—1999年)、87 873[23](2000—2009年)及98 822[1](2010—2018年)。 表 2 溃坝坝型统计
Table 2. Statistics of dam types of dam failure cases
序号 一级分类 1984—1999年 2000—2018年 溃坝数/座 占比/% 溃坝数/座 占比/% 1 混凝土坝 12 0.35 1 1.19 2 浆砌石坝 33 0.95 1 1.19 3 土坝 3 221 93.17 74 88.10 ① 均质土坝 2 977 86.12 59 70.24 ② 黏土斜墙坝 11 0.32 ③ 黏土心墙坝 181 5.24 8 9.52 ④ 土石混合坝 19 0.55 1 1.19 ⑤ 其他 1 0.03 1 1.19 ⑥ 不详 32 0.93 5 5.95 4 堆石坝 31 0.90 1 1.19 5 其他 4 0.12 2 2.38 6 不详 156 4.51 5 5.95 合计 3 457 100.00 84 100.00 表 3 1954—2018年我国溃坝成因统计
Table 3. Statistics on causes of dam failure cases in China from 1954 to 2018
序号 分类 溃坝原因 1954—1999年 2000—2018年 所有溃坝 运行中溃坝 所有溃坝 运行中溃坝 溃坝数/座 比例/% 溃坝数/座 比例/% 溃坝数/座 比例/% 溃坝数/座 比例/% 1 漫顶 超标准洪水 424 12.26 293 12.43 45 53.57 42 55.26 泄洪能力不足 1 348 38.99 832 35.30 2 2.38 2 2.63 2 质量问题 稳定问题 121 3.50 93 3.95 5 5.95 5 6.58 渗流问题 889 25.72 713 30.25 20 23.81 18 23.68 工程缺陷 281 8.13 163 6.92 4 4.76 4 5.26 3 管理不当 超蓄 40 1.16 32 1.36 2 2.38 2 2.63 维护运用不良 62 1.79 31 1.32 1 1.19 溢洪道未及时拆除 15 0.43 11 0.47 无人管理 51 1.48 38 1.61 4 其他 库区或溢洪道塌方 66 1.91 50 2.12 1 1.19 1 1.32 人工扒坝 81 2.34 58 2.46 工程设计布置不当 20 0.58 14 0.59 1 1.19 上游垮坝 5 0.14 2 0.08 其他 5 0.14 2 0.08 3 3.57 2 2.63 5 原因不详 49 1.42 25 1.06 合计 3 457 100.00 2 357 100.00 84 100.00 76 100.00 -
[1] 中华人民共和国水利部. 中国水利统计年鉴2018[M]. 北京: 中国水利水电出版社, 2018. Ministry of Water Resources of PRC. China water statistical yearbook 2018[M]. Beijing: China Water & Power Press, 2018. (in Chinese) [2] 中华人民共和国水利部, 中华人民共和国国家统计局. 第一次全国水利普查公报[J]. 中国水利,2013(7):1-3. (Ministry of Water Resources of PRC, National Bureau of Statistics of PRC. Bulletin of the first national census of water resources[J]. China Water Resources, 2013(7): 1-3. (in Chinese) doi: 10.3969/j.issn.1000-1123.2013.07.002 [3] ICOLD. Lessons from dam incidents[R]. Paris: International Commissionon Large Dams (ICOLD), 1974. [4] ICOLD. Deterioration of dams and reservoirs[R]. Paris: International Commission on Large Dams (ICOLD), 1983. [5] ICOLD. Dam failures statistical analysis[R]. Bulletin 99. Paris: International Commission on Large Dams (ICOLD), 1995. [6] USCOLD. Lessons from dam incidents, USA[M]. New York: American Society of Civil Engineers, 1975. [7] USCOLD. Lessons from dam incidents, USA-II[M]. New York: American Society of Civil Engineers, 1988. [8] ANCOLD. Status of dam safety in Australia[R]. Bulletin No. 91, Hobart, Tasmania: Australian National Committee on Large Dams, 1992. [9] ZHANG L M, XU Y, JIA J S. Analysis of earth dam failures: a database approach[J]. Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards, 2009, 3(3): 184-189. doi: 10.1080/17499510902831759 [10] 傅志敏, 杜汶桐, 孟颖, 等. 基于GeoDam-BREACH与Graham法的溃坝生命损失估算[J]. 水利水运工程学报,2019(2):93-98. (FU Zhimin, DU Wentong, MENG Ying, et al. Estimation of life loss by dam-break flood based on GeoDam-BREACH and Graham methods[J]. Hydro-Science and Engineering, 2019(2): 93-98. (in Chinese) [11] 杨德玮, 盛金保, 彭雪辉, 等. BREACH模型与MIKE21模型在溃坝风险中的耦合分析[J]. 水利水运工程学报,2016(6):23-28. (YANG Dewei, SHENG Jinbao, PENG Xuehui, et al. Coupling analysis of MIKE21 model and BREACH model for dam-break risk[J]. Hydro-Science and Engineering, 2016(6): 23-28. (in Chinese) [12] 水利部工程管理局. 全国水库垮坝登记册[M]. 北京: 水利部工程管理局, 1981. Department of Water Resources Engineering Administration. National register of reservoir breakdowns[M]. Beijing: Department of Water Resources Engineering Administration, 1981. (in Chinese) [13] 水利部水利管理司. 全国水库垮坝登记册(1981—1990)[M]. 北京: 水利部水利管理司, 1993. Department of Water Resources Management. National register of reservoir breakdowns (1981—1990)[M]. Beijing: Department of Water Resources Management, 1993. (in Chinese) [14] 解家毕, 孙东亚. 全国水库溃坝统计及溃坝原因分析[J]. 水利水电技术,2009,40(12):124-128. (XIE Jiabi, SUN Dongya. Statistics of dam failures in China and analysis on failure causations[J]. Water Resources and Hydropower Engineering, 2009, 40(12): 124-128. (in Chinese) doi: 10.3969/j.issn.1000-0860.2009.12.032 [15] 蒋金平, 杨正华. 中国小型水库溃坝规律与对策[J]. 岩土工程学报,2008,30(11):1626-1631. (JIANG Jinping, YANG Zhenghua. Laws of dam failures of small-sized reservoirs and countermeasures[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(11): 1626-1631. (in Chinese) doi: 10.3321/j.issn:1000-4548.2008.11.009 [16] 水利部大坝安全管理中心. 我国典型水库溃坝现场调查报告[R]. 南京: 水利部大坝安全管理中心, 2013. Dam Safety Management Center of Ministry of Water Resources. Field investigation report of typical reservoir dam break in China[R]. Nanjing: Dam Safety Management Center of Ministry of Water Resources, 2013. (in Chinese) [17] 张建云, 杨正华, 蒋金平. 水库大坝病险和溃坝的研究与警示[M]. 北京: 科学出版社, 2014. ZHANG Jianyun, YANG Zhenghua, JIANG Jinping. A study on reservoir dam defects and breaches in China[M]. Beijing: Science Press, 2014. (in Chinese) [18] 李杰. 核电风险接受度分析方法与影响因素综述[J]. 武汉理工大学学报(社会科学版),2017,30(4):10-16. (LI Jie. Literature review of methods and factors of public acceptance in nuclear power risk[J]. Journal of Wuhan University of Technology (Social Sciences Edition), 2017, 30(4): 10-16. (in Chinese) [19] 梁哲, 许洁虹, 李纾, 等. 突发公共安全事件的风险沟通难题——从心理学角度的观察[J]. 自然灾害学报,2008,17(2):25-30. (LIANG Zhe, XU Jiehong, LI Shu, et al. Perplexing problems in risk communication of emergent public security events: a psychological perspective[J]. Journal of Natural Disasters, 2008, 17(2): 25-30. (in Chinese) doi: 10.3969/j.issn.1004-4574.2008.02.005 [20] 盛金保, 厉丹丹, 蔡荨, 等. 大坝风险评估与管理关键技术研究进展[J]. 中国科学: 技术科学,2018,48(10):1057-1067. (SHENG Jinbao, LI Dandan, CAI Qian, et al. Research progress and its practice of key techniques for dam risk assessment and management[J]. Scientia Sinica Technologica, 2018, 48(10): 1057-1067. (in Chinese) doi: 10.1360/N092018-00277 [21] 中国水利年鉴编辑委员会. 中国水利年鉴1991[M]. 北京: 水利电力出版社, 1991. Editorial Committee of China Water Resources Yearbook. China water resources yearbook 1991[M]. Beijing: Hydraulic and Electric Power Press, 1991. (in Chinese) [22] 中国水利年鉴编纂委员会. 中国水利年鉴2000[M]. 北京: 中国水利水电出版社, 2000. Editorial Committee of China Water Resources Yearbook. China water resources yearbook 2000[M]. Beijing: China Water & Power Press, 2000. (in Chinese) [23] 中国水利水电出版社. 中国水利年鉴2010[M]. 北京: 中国水利水电出版社, 2010. China WaterPower Press. China water resources yearbook 2010[M]. Beijing: China Water & Power Press, 2010. (in Chinese) [24] FOSTER M, FELL R, SPANNAGLE M. The statistics of embankment dam failures and accidents[J]. Canadian Geotechnical Journal, 2000, 37(5): 1000-1024. doi: 10.1139/t00-030 [25] 孙金华. 我国水库大坝安全管理成就及面临的挑战[J]. 中国水利,2018(20):1-6. (SUN Jinhua. Achievements of reservoir dam safety management in China and challenges[J]. China Water Resources, 2018(20): 1-6. (in Chinese) doi: 10.3969/j.issn.1000-1123.2018.20.001 [26] 戚伟, 刘盛和, 赵美风. "胡焕庸线"的稳定性及其两侧人口集疏模式差异[J]. 地理学报,2015,70(4):551-566. (QI Wei, LIU Shenghe, ZHAO Meifeng. Study on the stability of Hu Line and different spatial patterns of population growth on its both sides[J]. Acta Geographica Sinica, 2015, 70(4): 551-566. (in Chinese) doi: 10.11821/dlxb201504004 [27] 厉丹丹, 柳志国, 李雷. 溃坝事件中的人因失误分析[J]. 水利水运工程学报,2013(6):92-95. (LI Dandan, LIU Zhiguo, LI Lei. Analysis of human error in dam break accidents[J]. Hydro-Science and Engineering, 2013(6): 92-95. (in Chinese) doi: 10.3969/j.issn.1009-640X.2013.06.014 [28] 张建云, 杨正华, 蒋金平. 我国水库大坝病险及溃决规律分析[J]. 中国科学: 技术科学,2017,47(12):1313-1320. (ZHANG Jianyun, YANG Zhenghua, JIANG Jinping. An analysis on laws of reservoir dam defects and breaches in China[J]. Scientia Sinica Technologica, 2017, 47(12): 1313-1320. (in Chinese) doi: 10.1360/N092016-00295 [29] 《第三次气候变化国家评估报告》编写委员会. 第三次气候变化国家评估报告[M]. 北京: 科学出版社, 2015. Committee for the Preparation of the Third National Assessment of Climate Change. Third national assessment of climate change[M]. Beijing: Science Press, 2015. (in Chinese) [30] 张建云. 气候变化与水利工程安全[J]. 岩土工程学报,2009,31(3):326-330. (ZHANG Jianyun. Climate change and safety of water conservancy projects[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(3): 326-330. (in Chinese) doi: 10.3321/j.issn:1000-4548.2009.03.003 [31] 张建云, 向衍. 气候变化对水利工程安全影响分析[J]. 中国科学: 技术科学,2018,48(10):1031-1039. (ZHANG Jianyun, XIANG Yan. Analysis on the impact of climate change on the water conservancy project safety[J]. Scientia Sinica Technologica, 2018, 48(10): 1031-1039. (in Chinese) doi: 10.1360/N092018-00283 [32] MORGAN M G. Safety of existing dams: evaluation and improvement, committee on the safety of existing dams[M]. Washington, DC: National Academy Press, 1983. [33] 叶伟, 马福恒, 胡江, 等. 旱涝急转下斜墙坝渗流特性试验研究[J]. 岩土工程学报,2018,40(10):1923-1929. (YE Wei, MA Fuheng, HU Jiang, et al. Seepage behaviors of inclined wall dams under drought-flood abrupt alternation[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(10): 1923-1929. (in Chinese) [34] 汝乃华, 姜忠胜. 大坝事故与安全·拱坝[M]. 北京: 中国水利水电出版社, 1995. RU Naihua, JIANG Zhongsheng. Arch dams·accident and safety of large dams[M]. Beijing: China Water & Power Press, 1995. (in Chinese) [35] 梁音, 刘宪春, 曹龙熹, 等. 中国水蚀区土壤可蚀性K值计算与宏观分布[J]. 中国水土保持,2013(10):35-40. (LIANG Yin, LIU Xianchun, CAO Longxi, et al. K value calculation of soil erodibility of China water erosion areas and its macro-distribution[J]. Soil and Water Conservation in China, 2013(10): 35-40. (in Chinese) doi: 10.3969/j.issn.1000-0941.2013.10.011 -